Revel Ridge Project
Project Overview
Orior Metals Corp. holds an option, dated December 4, 2025, to acquire a 100% interest in the Revel Ridge Project from Huakan International Mining Inc. Upon completion of the Proposed Transaction, the Resulting Issuer will indirectly hold the option on the Revel Ridge Project.
The project carries a substantial record of prior work. Drilling by all operators from the first drillhole in 1983 to 2022 totals 79,425 metres, including 120 drillholes for a total of 38,540 m completed by Rokmaster Resources Corp. between September 2020 and October 2022.
Location and Access
The 2023 PEA cites existing infrastructure at Revel Ridge, which lies approximately 42 kilometres by road north of Revelstoke.
- All-weather access roads
- 3 km of underground development
- Permitted waste rock storage facility
- Full camp facility
- Approximately 15 km from the BC Hydro electrical system and the City of Revelstoke with its skilled labor pool
Infrastructure as cited in the Rokmaster Resources Corp. 2023 PEA news release (prior operator).
Geology and Zones
The 2023 MRE comprises five mineralized zones, four related to the Main Deformation Zone (MDZ). Mineralization associated with the MDZ is classified as a polymetallic orogenic gold deposit. Rokmaster reported the strike length of the MDZ as a minimum of 5.7 km through geological mapping, drilling and geochemistry, and the strike length of the mineralized volumes in the 2023 MRE as approximately 2.0 km.
- RRMZRevel Ridge Main ZoneHosted within the MDZ, a highly planar, 55-60 degree northeast-dipping ductile deformation zone, with an average width of mineralization of 2.5 m. The single largest domain in the 2023 MRE.
- RRFZFootwall ZoneOne of four zones related to the Main Deformation Zone, with characteristics common to orogenic gold deposits.
- RRHZHanging Wall ZoneOne of four zones related to the Main Deformation Zone, with characteristics common to orogenic gold deposits.
- RRMEXMain Zone ExtensionOne of four zones related to the Main Deformation Zone, with characteristics common to orogenic gold deposits.
- RRYZYellowjacket ZoneHigh-grade silver-zinc-lead carbonate replacement mineralization 50 to 75 m into the hanging wall of the MDZ, amenable to underground access.
Sections and Block Model
2023 Mineral Resource Estimate
Reported by Rokmaster Resources Corp., a prior option holder, with an effective date of June 6, 2023, and reviewed by Fred Brown (P.Geo.) and Eugene Puritch (P.Eng., FEC, CET) of P&E Mining Consultants Inc., independent of Rokmaster. These are prior-operator NI 43-101 results, not a current estimate of 1470350 B.C. Ltd., Orior or Renatus.
Measured and Indicated, all zones
1.53 million
AuEq ounces within 7.16 million tonnes with an average grade of 6.63 g/t AuEq
Inferred, all zones
1.49 million
AuEq ounces within 7.56 million tonnes at an average grade of 6.11 g/t AuEq
Revel Ridge Main Zone (RRMZ)
M&I: 1.09 million AuEq ounces in 4.47 million tonnes grading 7.59 g/t AuEq.
Inferred: 1.24 million AuEq ounces in 5.69 million tonnes grading 6.79 g/t AuEq.
Footwall Zone (RRFZ)
M&I: 171,100 AuEq ounces grading 5.10 g/t AuEq in 1.04 million tonnes.
Inferred: 104,900 AuEq ounces grading 4.63 g/t AuEq in 704,700 tonnes.
Footnotes 1-6
(1) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
(2) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration, however there is no certainty an upgrade to the Inferred Mineral Resource would occur or what proportion would be upgraded to an Indicated Mineral Resource.
(3) The Mineral Resources in this estimate were calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Standards on Mineral Resources and Reserves, Definitions and Guidelines (2014) prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council and CIM Best Practices Guidelines (2019).
(4) The following parameters were used to derive the NSR block model C$/tonne cut-off values used to define the Mineral Resource: - March 2023 Consensus Economics long term forecast metal prices of Au US$1,750/oz, Ag US$22/oz, Pb US$0.95/lb, Zn US$1.26/lb - Exchange rate of US$0.74 = CAD $1.00 - Main Zone process recoveries of Au 96%, Ag 85%, Pb 71%, Zn 70% - Yellowjacket Zone process recoveries of Au 86%, Ag 94%, Pb 88%, Zn 93%
(5) MDZ AuEq = Au g/t + (Ag g/t x 0.010) + (Pb% x 0.265) + (Zn% x 0.314); MDZ AgEq = Ag g/t + (Au g/t x 101.478) + (Pb% x 26.933) + (Zn% x 31.847); RRYZ AuEq = (Ag g/t x 0.008) + (Pb% x 0.310) + (Zn% x 0.457); RRYZ AgEq = Ag g/t + (Pb% x 40.588) + (Zn% x 59.737)
(6) Troy ounces ("ounces"), grams per tonne ("g/t"), metric tonne ("t") Net Smelter Return ("NSR"), Canadian Dollar ("C$"), 1,000 ("k").
2023 Preliminary Economic Assessment
Reported by Rokmaster Resources Corp. (prior operator) with an effective date of December 29, 2023, prepared by Ausenco Engineering Canada ULC, supported by Mining Plus Canada Consulting Ltd., Knight Piesold Ltd., P&E Mining Consultants Inc., and Canenco Consulting Corp. Amounts are in Q4 2023 Canadian dollars unless noted, using metal prices of US$1,850/oz Au, US$23.00/oz Ag, US$1.26/lb Zn and US$0.90/lb Pb.
Caution
Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and includes Inferred Mineral Resources that are too speculative to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that PEA results will be realized.- After-tax NPV5.0%
- C$454M
- 21.1% IRR; after-tax payback period of 3.2 years discounted at 5.0%
- Pre-production CAPEX
- C$588M
- US$436M, including contingency of C$84M (US$62M); exchange rate C$/US$ of 0.74
- LOM average annual payable production
- 158 koz AuEq
- per year (114 koz Au per year, 940 koz Ag, 32.6 mlbs Zn, 19.6 mlbs Pb) over 11.4 years
- LOM cash costs
- US$540/oz
- payable Au on a by-product basis
- LOM AISC
- US$836/oz
- payable Au on a by-product basis
- Process plant
- 2,920 t/d
- crush and particle sort-mill-flotation-POX and gold plant producing gold/silver dore and saleable zinc and lead concentrates
Mine Plan
Owner-operated, ramp-developed, long-hole stope underground mine, with 18 months of mine ramp access and development and construction of the process plant and filtered waste management facility planned prior to Year 1.
Diluted mill feed over LOM: 11.77 Mt including Inferred material, comprising Main Zone 11.43 Mt averaging 3.80 g/t Au, 37.37 g/t Ag, 2.34 % Zn, 1.30 % Pb (diluted) and Yellowjacket Zone 0.34 Mt averaging 8.61% Zn, 2.66% Pb, 65.0 g/t Ag and 0.07 g/t Au (diluted).
Option Terms
Pursuant to the Option Agreement, Orior has been granted the sole and exclusive option to acquire a 100% interest in the Revel Ridge Project from Huakan. To exercise the option, Orior must make aggregate cash payments of $59.0 million over six years and issue $2.0 million of Orior Shares on or before December 4, 2026.
| Timing | Cash payment |
|---|---|
| Shortly after executionPaid | $500,000 |
| 180 days after executionPaid | $500,000 |
| First anniversary | $1.0 million |
| Second anniversary | $4.5 million |
| Third anniversary | $11.5 million |
| Fourth anniversary | $9.0 million |
| Fifth anniversary | $11.5 million |
| Sixth anniversary | $20.5 million |
- Orior may accelerate the exercise of the option during the first three years of the Option Agreement by making the applicable accelerated payment prescribed by the Option Agreement.
- During the option period, Orior has the exclusive right to explore and advance the Revel Ridge Project and is responsible for funding exploration activities and maintaining the Revel Ridge Project in good standing.
- The option is exercisable at Orior's discretion, and amounts paid by Orior before any termination are non-refundable.
- Upon the exercise of the option, all rights and interests in the Revel Ridge Project and all outstanding shares of Huakan will be transferred to Orior, free and clear of encumbrances other than permitted encumbrances.
Source: 1470350 B.C. Ltd. news release, September 14, 2026.